Start typing and press Enter to search

Sale!

Coilhose Pneumatics 1/4″ ID 1-1/2 ft. Long Lead-In Whip Hose FNPT x MNPT Swivel Ends, 200 Working psi,

$99.00 $1,171.43
Review

Coxreels 50 ft. Spring Retractable Hose Reel 4,000 psi, Hose IncludedManufacturer Part #: EZ-HP-350S/N: 61926663UNSPSC: 40142022UPC: 674255299641(Minimum Order Quantity=1, Package Quantity=1)Specifications:StyleSpring RetractableDrive TypeSpring Retractabl



SKU: WZdaTW1uoLYKUsqT Category:

Coxreels 50 ft. Spring Retractable Hose Reel 4,000 psi, Hose Included

Manufacturer Part #: EZ-HP-350

S/N: 61926663

UNSPSC: 40142022

UPC: 674255299641

(Minimum Order Quantity=1, Package Quantity=1)

Specifications:

Style Spring Retractable
Drive Type Spring Retractable
Hose Included Yes
Hose Length (Feet) 50.00
Hose Inside Diameter (Inch) 3/8
Maximum Working Pressure (Psi – 3 Decimals) 4000
Hose Outside Diameter (Decimal Inch) 0.6900
Application Grease or Hydraulic Oil
Mount Type Workbench, Wall
For Use With Automotive, Construction, Hose Rubber, Industrial, Industrial MRO, Lubrication, Mining, Power Transmission
Mounting Location WorkBench, Wall
Material Steel
Color Blue
Reel Material Steel
Hose Material Rubber
Reel Color Blue
Inlet Size 3/8
Series EZ-SH
Duty Level Heavy
Overall Width (Inch) 9-1/4
Length (Inch) 19-5/8
Height (Inch) 21
Fitting Size 3/8 NPT

Reviews

There are no reviews yet.

Be the first to review “Coilhose Pneumatics 1/4″ ID 1-1/2 ft. Long Lead-In Whip Hose FNPT x MNPT Swivel Ends, 200 Working psi,”

Your email address will not be published. Required fields are marked *