Start typing and press Enter to search

Sale!

Coilhose Pneumatics 1/4″ ID 2 ft. Long Lead-In Whip Hose MNPT Swivel x MNPT Swivel Ends, 140 Working psi,

$6.26 $7.82
Review

Pryor Letter K, Individual Hardened Steel Type 3/32 Inch CharacterManufacturer Part #: TI025 KS/N: 87862306UNSPSC: 23251807(Minimum Order Quantity=1, Package Quantity=1)Specifications:CharacterKMaterialHardened Steel



SKU: 48uIeCMRxr22Clev Category:

Pryor Letter K, Individual Hardened Steel Type 3/32 Inch Character

Manufacturer Part #: TI025 K

S/N: 87862306

UNSPSC: 23251807

(Minimum Order Quantity=1, Package Quantity=1)

Specifications:

Character K
Material Hardened Steel

Reviews

There are no reviews yet.

Be the first to review “Coilhose Pneumatics 1/4″ ID 2 ft. Long Lead-In Whip Hose MNPT Swivel x MNPT Swivel Ends, 140 Working psi,”

Your email address will not be published. Required fields are marked *