Start typing and press Enter to search

Sale!

Coilhose Pneumatics 1/4″ ID 3 ft. Long Lead-In Whip Hose FNPT x MNPT Swivel Ends, 200 Working psi,

$6.42 $8.02
Review

C.H. Hanson Letter X Machine Made Individual Steel Stamp 1/8" CharacterManufacturer Part #: 20200XS/N: 72065345UNSPSC: 23251807(Minimum Order Quantity=1, Package Quantity=1)Specifications:CharacterXCharacter Size3.7MaterialSteel



SKU: X6Ns5snQESAZd5ZS Category:

C.H. Hanson Letter X Machine Made Individual Steel Stamp 1/8″ Character

Manufacturer Part #: 20200X

S/N: 72065345

UNSPSC: 23251807

(Minimum Order Quantity=1, Package Quantity=1)

Specifications:

Character X
Character Size 3.7
Material Steel

Reviews

There are no reviews yet.

Be the first to review “Coilhose Pneumatics 1/4″ ID 3 ft. Long Lead-In Whip Hose FNPT x MNPT Swivel Ends, 200 Working psi,”

Your email address will not be published. Required fields are marked *