Start typing and press Enter to search

Sale!

Coilhose Pneumatics 3/8″ ID 3 ft. Long Lead-In Whip Hose FNPT x MNPT Swivel Ends, 200 Working psi,

$43.72 $87.43
Review

PRO-SOURCE 3/8" ID x 0.69" OD 50 ft. Long Multipurpose Air Hose MNPT x MNPT Ends, 300 Working psi, -30 to 176F, 1/4" Fitting, RedManufacturer Part #: 8350003811PROS/N: 57685778UNSPSC: 40142009(Minimum Order Quantity=1, Package Quantity=1)Specifications:Hos



SKU: fwvtJA5zntcVucKK Category:

PRO-SOURCE 3/8″ ID x 0.69″ OD 50 ft. Long Multipurpose Air Hose MNPT x MNPT Ends, 300 Working psi, -30 to 176F, 1/4″ Fitting, Red

Manufacturer Part #: 8350003811PRO

S/N: 57685778

UNSPSC: 40142009

(Minimum Order Quantity=1, Package Quantity=1)

Specifications:

Hose Type Multipurpose Air Hose
Length Ft. (Feet) 50
Type Multipurpose Air Hose
Color Red
Material Rubber
Inside Diameter (Inch) 3/8
Fitting Size 1/4
End Connections MNPT x MNPT
Length 50
Outside Diameter (Decimal Inch – 4 Decimals) 0.6900
Maximum Temperature (F) ( – 0 Decimals) 158.000
Minimum Temperature (Deg F – 3 Decimals) -22.000
Working Pressure 300.000
UNSPSC Code 40142009

Reviews

There are no reviews yet.

Be the first to review “Coilhose Pneumatics 3/8″ ID 3 ft. Long Lead-In Whip Hose FNPT x MNPT Swivel Ends, 200 Working psi,”

Your email address will not be published. Required fields are marked *