Start typing and press Enter to search

Sale!

Legacy Manufacturing 3/8″ ID x 0.61″ OD 6 ft. Long Lead-In Whip Hose FNPT x MNPT Ball Swivel Ends, 300 Working psi, 140, 1/4″ Fitting, Green HFZ3806YW2B

$28.40 $35.50
Review

Tempil 450F Tempilstik Temp Indicating Marker 232CManufacturer Part #: 28039S/N: 06831515UNSPSC: 55120000(Minimum Order Quantity=10, Package Quantity=1)(Please order in multiples of 10)Specifications:TypeTemperature Indicating StickTemperature Rating232.0



SKU: 2E88B5UGicyNpC5O Category:

Tempil 450F Tempilstik Temp Indicating Marker 232C

Manufacturer Part #: 28039

S/N: 06831515

UNSPSC: 55120000

(Minimum Order Quantity=10, Package Quantity=1)

(Please order in multiples of 10)

Specifications:

Type Temperature Indicating Stick
Temperature Rating 232.0 C, 450.0 F
Compatible Material Aluminum, Ceramic, Glass, Iron, Plastic, Stainless Steel, Steel
Features 116 temperatures available from 100 F(38 C) to 2000 F(1093 C), Stick instantly melts at designated temperature for easy and immediate visual inspection, Calibration-free with 100% reliability, Accurate to within +/- 1% of Fahrenheit and +/- 3% Celsius rat
Tip Shape Bullet
Temperature Rating (F) 232.0 C, 450.0 F
Application Aluminum, Ceramic, Glass, Iron, Plastic, Stainless Steel, Steel
UNSPSC Code 55121731

Reviews

There are no reviews yet.

Be the first to review “Legacy Manufacturing 3/8″ ID x 0.61″ OD 6 ft. Long Lead-In Whip Hose FNPT x MNPT Ball Swivel Ends, 300 Working psi, 140, 1/4″ Fitting, Green HFZ3806YW2B”

Your email address will not be published. Required fields are marked *