Value Collection 3/8″ ID 2-1/2 ft. Long Lead-In Whip Hose 1/4″ Fitting, BD-KP1740
$16.92
$21.15
NMC 5 Qty 1 Pack Hazardous Materials Label Graphic: Letter W with Slash Through It, 7 x 7", Black, White, Pressure Sensitive VinylManufacturer Part #: DCL106S/N: 63377683UNSPSC: 55121600UPC: 887481038131(Minimum Order Quantity=1, Package Quantity=5)Specifi
NMC 5 Qty 1 Pack Hazardous Materials Label Graphic: Letter W with Slash Through It, 7 x 7″, Black, White, Pressure Sensitive Vinyl
Manufacturer Part #: DCL106
S/N: 63377683
UNSPSC: 55121600
UPC: 887481038131
(Minimum Order Quantity=1, Package Quantity=5)
Specifications:
Label Message Type | Hazardous Material |
Message Type | Hazardous Materials |
Label Format | Graphic |
Label Message | Letter W with Slash Through It |
Language | English |
Overall Height (Decimal Inch) | 7.0000 |
Graphic | Graphic Only |
Overall Width (Decimal Inch – 4 Decimals) | 7.0000 |
Material | Vinyl |
Material Type | Pressure Sensitive Vinyl |
Adhesion Type | Removable |
Message Color | Black |
Background Color | White |
Length (Inch) | 7 |
Shape | Square |
Features | Graffiti-Proof, Waterproof |
Package Type | Sheet |
Graphic Type | Letter W with Slash Through It |
Special Item Information | Chemical-Resistant, Graffiti-Proof, Waterproof |
Reviews
There are no reviews yet.